TitleProduct

Single Boom Underground Jumbo Drilling Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Henan

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-11 05:22

  • Browse the number:

    184

Send an inquiries

Company Profile

Ji Ning Hengwang Mining Machinery Co., Ltd.

By certification [File Integrity]

Contact:Ms. Si(Mr.)  

Email:

Telephone:

Phone:

Area:Henan

Address:Henan

Website: http://defydrillingrig.tj-runtai.com/

PRODUCT DETAILS

I. Simple description

Single Boom Underground Jumbo Drilling Machine is specially designed for underground mining, metallurgy, water electricity, railways, highways, tunnels, culverts narrow mine roadway excavation blasting holes and drill holes, the work mechanism adopts full hydraulic pressure drive, drilling speed can reach 0.8~2 m/min, the engine provides walking power, the fuselage is small, compact structure, low center of gravity, flexible, stable work, etc.Jumbo drill is not only to improve working safety and also reduce the working strength of laborer and improve work efficiency.

II. Technical Specification of Single Boom Underground Jumbo Drilling Machine

  Name Parameter
Total Dimension(LxWxH)mm 11304x1420x2727/2127
Adaptable section(bxh)mm 2.5x2.5-5.2x4.37
Borehole diameter mm Φ41-φ89
Drill rod length mm 3090(standard) 3700(option)
Borehole depth mm 2795 3400
Drilling speed m/min 0.8-2
Motor KW 37
Hydraulic oil tank L 120
Weight kg 11000
Drill boom Jackdrill model HC25/HC50
(option)
HYD200 (standard)
Rotation ° Positive 180/Reverse 180
Promoting beam One-piece steel(standard),aluminium alloy
(option)
Thruster bow/face upward° bow95/face upward3
Stroke mm 1550
Chassis Diesel engine power HP/KW 87/64
Turn angle ° ±40°
Tyre 10x R15
Rear axle swinging Angle ° ±7°
Approach angle° 15
Min.turning radius m inside>3.08/outside>4.85(standard)
Walking speed km/h Level road>14;1:8 gradient>4.0
Min. ground clearance mm 307
Brake Dry brake,pliers disc brake
Fuel tank capcity L 45L
Air supply system Flow L/min 260
Working air pressure Mpa 0.2-0.8
Water supply system Flow L/min 35
Working water pressure Mpa 0-8-1.2
Electrical
system
Total motor power KW 41(37+4)
Supply voltage V 380/660
Motor speed r/min 1483
Accumulator V/Ah 2 x 12/ 120
Traffic lights W 4x65
Working lamp W 2x65
Electrical system V 24

Sales Manager: Debbie Liu

Mobile: +86-13213019085 
Facebook : debbieliu004